← Back to the Atlas

Heritage record

Thori Mori

SindhBridgeProtected
The water drain culvert is constructed with burnt bricks (30.4 x 14 x 7.6 m) cheroli is used as mortar. The central part of the culvert has completely collapsed. But the columns on either side are surviving. The columns of the bridge are rectangular in shape, its exterior dimensions are 5.4 m (length) and 4.5 m (breadth). The collapsed central part (path area) measures about 6.3 m. This culvert was constructed for the purpose of water drain canal in the British period. This damaged structure needs to be restored. There is a new bridge constructed recently by Agriculture dept. government of Sindh with burnt bricks and cement.
Record ID
10011
Province / territory
Sindh
District
Badin
Typology
Monument
Subtype
Bridge
Period
Historic
Legal status
Not Protected — UNVERIFIED; no statute or notification cited
Coordinates
24.79797, 68.67434 — source-provided, not field-verified
Verification status
source_record; automatically_standardized; verification_required
Sources
Shiekh, Nilofer. (2021). Documentation of the Heritage Sites and Monuments of Sindh. Endowment Fund Trust for Preservation of the Heritage of Sindh.

Found an error in this record? Submit a correction — quote record ID 10011.

Pakistan's Heritage Digital Ecosystem: Heritage Atlas · PWHI · Visual Record · Forum